GovWire

Transparency data: Reinforced autoclaved aerated concrete (RAAC) in hospitals: management information

Department Of Health

October 19
15:00 2023

Details

This page gives information on hospital sites in England that are confirmed to contain reinforced autoclaved aerated concrete (RAAC).

All hospital sites with confirmed RAAC are in NHS Englands ongoing national RAAC programme. This programme isbacked with significant additional funding of 698 million from 2021 to 2025 for trusts to put in place necessary remediation and failsafe measures.

The information on the spreadsheet includes:

  • site location

  • NHS trust

  • RAAC status

As of 17 October 2023, there are 42 hospital sites with confirmed RAAC in the rolling national programme. Eighteen sites have been identified since May 2023, following updated monitoring guidance from the Institution of Structural Engineers (IStructE). Sites join the programme regardless of the extent to which RAAC is present on the estate or whether its in clinical or non-clinical space.

Three sites have entirely eradicated previously confirmed instances of RAAC and have therefore left the programme. Seven hospitals that are most affected by RAAC are also part of the New Hospital Programme for full replacement by 2030.

Where possible RAAC is identified, visual inspections and structural surveys take place to verify its presence and level of risk. Once the presence of RAAC is confirmed, trusts join the national RAAC programme. This programme supports mitigation, remediation and wider planning to maintain safety.

Keeping hospital capacity open while carefully monitoring and mitigating RAAC until it can be removed is fully in line with current evidence and recommendations from IStructE.

Published 19 October 2023

Share This


Enjoyed this? Why not share it with others if you've found it useful by using one of the tools below: