This guidance is for operators:
- of an existing landfill site
- who are planning to build a new landfill site
- who are planning to extend a landfill site
If you are a business or waste treatment operator that sends waste to a landfill site, see our guide on disposing of waste to landfill.
If you are a business that dredges inland waterways, see our guide on depositing dredged waste on land.
- Landfills for inert waste
The environmental permitting requirements for landfills for inert waste and how to comply with your permit.
- Deposit waste over existing waste at landfills (overtipping)
You need approval from the Environment Agency before you deposit waste over completed cells that have permanently stopped taking waste.
- Plan the environmental setting of your site
What you need to do when you start planning your landfill site.
- What to include in your environmental setting and site design report
This section will help you complete your permit application for a landfill for inert waste, or to deposit waste on land as a recovery activity. It will help you decide what information you must include in your application.
- What to include in your environmental setting and installation design report
This section will help you develop your permit application for a landfill for hazardous or non-hazardous waste. It will help you decide what information you must include in your application.
- What to include in your hydrogeological risk assessment
This section will help you develop your application for a permit for a landfill or to deposit waste on land as a recovery activity. It will help you decide what information you must include in your application.
- How to do a stability risk assessment: landfill sites for inert waste or deposit for recovery activities
What to include in a stability risk assessment for a landfill site for inert waste or deposit for recovery activity.
- How to do a stability risk assessment: landfill sites for hazardous and non-hazardous waste
What to include in a stability risk assessment for a landfill site for hazardous and non-hazardous waste.
- Calculate your financial provision
How to calculate your financial provision, what it needs to cover and how to agree it with the Environment Agency.
- Design and build your landfill site
The design requirements that you need to meet in your environmental permit application and how to comply with your permit.
- Construction quality assurance (CQA)
How to create a CQA plan, the CQA qualification requirements you need to meet and how to create a validation report.
- How the Environment Agency makes decisions on landfill engineering
What the Environment Agency requires from you when you design and construct a landfill site.
- Develop and maintain management plans
You must manage your operations to prevent or minimise pollution from the activities authorised by your permit.
- Accept the right waste
How to inspect waste, check paperwork and sample and test the waste you accept.
- Manage leachate
How to manage the leachate produced by the waste in your site.
- Manage landfill gas
You must manage the landfill gas produced by the waste in your site.
- Monitor and report your performance
What you need to monitor and how to report your performance to meet your permit conditions.
- Review your hydrogeological risk assessment
What you need to include in your hydrogeological risk assessment and how to structure your report.