GovWire

Guidance: Section 62A Planning Application: S62A/2023/0022 - London Stansted Airport, Bassingbourn Road, Stansted CM24 1QW

Planning Inspectorate

August 8
10:35 2023

Type of application:

Full Planning Application

Applicant name:

Stansted Airport Limited (STAL)

Site address:

London Stansted Airport Bassingbourn Road Stansted Essex

Description of proposed development:

Partial demolition of the existing Track Transit System and full demolition of 2 no. skylink walkways and the bus-gate building. Construction of a 3-bay extension to the existing passenger building, baggage handling building, plant enclosure and 3 no. skylink walkways and associated hardstanding.

Case Officer:

Major Casework Team

Procedure:

TBC

Key dates:

Date
Date application valid 7 August 2023
Date by when representations must be made 8 September 2023
Hearing date and venue TBC
Target Decision 6 November 2023
Decision date TBC

Hearing Documents

Decision

Make a representation

The application can be inspected under the application plans and documents heading below.

You will be able to comment on this application until 8 September 2023

Please base your comments on planning matters.

Please avoid the use of inflammatory, discriminatory or abusive comments

All representations made in connection with the development proposal will be made publicly available on the website shortly after the end of the representation period. The name of the individual author or organisation will be published however addresses, signatures and contact details will not be published. We advise you not to include any other personal information about yourself or others.

OurCustomerPrivacy Noticesets out how we handle personal data in accordance with the law.

Send your comments via email to section62a@planninginspectorate.gov.uk

or write to

Inquiries and Major Casework Team
The Planning Inspectorate
3rd Floor
Temple Quay House
2 The Square
Temple Quay
Bristol
BS1 6PN

Sending comments by email will enable us to deal with them more quickly and is preferred.

Please include the application reference number and site address.

This application will be determined by an Inspector appointed by the Secretary of State. Shortly after the close of the representation period the Planning Inspectorate will consider whether a hearing is necessary. In the event that a hearing is scheduled, and you would wish to speak at the hearing, you must make this request at the time you submit your written representations.

Where the application is to be considered at a hearing, notice of the date, time and venue for the hearing along with the name of the person holding the hearing, will be published on this website at least two weeks before the date of the hearing.

Application Plans and Documents

Related Articles

Comments

  1. We don't have any comments for this article yet. Why not join in and start a discussion.

Write a Comment

Your name:
Your email:
Comments:

Post my comment

Recent Comments

Follow Us on Twitter

Share This


Enjoyed this? Why not share it with others if you've found it useful by using one of the tools below: